Power & Ground Detection

Before purchasing a generator, the location it will work on should be determined and a survey of power need has to be done. The most suitable generators are recommended to our customers following a free-of-charge survey of site and power need performed by all Aksa Authorized Service Points.

Important points to be considered in survey of site and power need:

  • To perform the power need survey in the right way, the active and reactive powers, startup (motor) loads, compensation and UPS loads must be taken into account.
  • The ground the generator will be placed on should be smooth
  • A proper air intake and output should be ensured.
  • A suitable fuel system should be available.
  • The outlet of the exhaust system should be of the shortest distance possible and should not damage the surroundings.